Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. InCommon should sign the eduGAIN Declaration as soon as possible
  2. TAC should work with Ops to operationalize eduGAIN over the next six months
  3. TAC should instantiate a new working group with a charter similar to the one based on the Future Work items listed below

Work Summary

We began our work with the following set of deliverables, derived from the recommendations of the first iteration of this working group:

...