titlePost-Phase 3 Metrics
Upon completion of Phase 3 (on February 15, 2016), the main InCommon aggregate was over 32MB in size, with 1991 IdPs and 3713 SPs.

Phase 4 [

...

DONE] Complete production integration with eduGAIN

Sync all metadata aggregates in the pipeline.

  1. Import global metadata into the fallback aggregate
    1. Sync the fallback aggregate with the main production aggregate.

...

Note
titlePost-Phase 4 Status

All metadata aggregates are in sync as of March 29, 2016. Full integration status has been achieved.